STOCKFARM
Suitable for grazing enterprises where anticipated usage is stockfloats, bogie drive fuel tankers, small tractors and implements.
Concrete Base

Steel Grid Component

Specification
Width across road 3310mm
Width from tip to tip of mesh sides 4370mm
Length going along the road 2100mm
Depth of concrete base 500mm
Nominal capacity W7 wheel load, 8 tonne axle load with safety factor
Grid rail size 75x50x4.0 grade 350 RHS
Installation
   
         
Prepare the site for your grid before the carrier arrives. We recommend excavation of the pit to sufficient depth to achieve suitable foundation, but also to keep the finished height of the grid above ground level. This minimises silting up of the pit and also acts as a speed trap. A minimum of 50mm layer of sand or crusher dust should be screeded level across the bottom of the pit to reduce the possibility of point loading.   When the carrier arrives, the grid can be lifted by the trucks crane into place.   Backfill carefully, ramming the earth in layers. After several weeks use, this fill will have settled and may need to be topped up to avoid depressions at the leading edges.
Additional Elements
       
REFLECTIVE SIGNS   FENCING